Sunday, August 24, 2008

Interior Work Well Underway



Interior work on the house is well underway. The above pictures show the last exterior door has been installed and the electrical wiring is complete. Notice how they cut into the styrofoam for the wiring on the ICF walls. This wiring will be covered with drywall for a seamless electrical and plumbing installation.


In this picture, the frames for the pocket doors on the craft room and laundry room are visible. This framing will allow the doors to slide into the wall wasting no space in the rooms on in the hallway for door openings. On Saturday, I met with Emily Heroman of NuCrete to go over the floor designs in house prior to their work beginning on Monday. I haven't heard that the weather will impact their work beginning, but we'll just have to wait and see. Hopefully they can start popping the lines for the flooring designs on Monday afternoon. Checkout the slideshow gallery for more pictures from Friday.